Foarsoarchsmaatregelen foar ynstallaasje en testmasjine fan haak -type skotblaasmasjineï¼ˆä¸ € ï¼ ‰

2021-06-03

Dehook type shot blasting masinehat oer it algemien in grutter uterlik, en it ynstallaasjeproses is relatyf yngewikkelder dan dat fan lytse apparatuer. Juste ynstallaasje en testmasjine binne de kaai foar it garandearjen fan de normale wurking fan 'e lettere apparatuer. Yn it gefal fan unskilled earste operaasjes binne brûkers ferplicht de ynstruksjes fan relevant personiel strikt te folgjen of nei de ynstruksjes te ferwizen. Unautorisearre operaasje kin maklik ûnomkearbere skea oan 'ehook shot blasting masine. Deshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Dehook type shot blasting masine is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Deprecautions for the installation and debugging of the relevant components are introduced below.
1. Shot blasting apparaat:
Deshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Hoist en skroeftransporteur:
Earst in test sûnder lading útfiere om te kontrolearjen oft de hijsemmer en de spiraalbladen yn 'e juste rjochting rinne, draai dan de riem fan' e takel oant in matige graad fan spanning om ôfwiking te foarkommen, en fier dan in ladingstest út om te kontrolearjen de operaasje- en transportkapasiteit, of d'r nuverheid is Lûd en trilling, kontrolearje en ferwiderje obstakels.
3. Pill-sân separator:
Kontrolearje earst as de beweging fan 'e ram fleksibel is, en kontrolearje dan de juste posysje fan' e skiedingsplaat, dan as de takel wurdt laden en debugge, is d'r trochgeande ynstream fan stielen sjitten, en kontrolearje oft de stielen sjitten útrinne en falle as de sleat wurdt ûntslein